Infrastructure >> Coated Duplex Boards & Newsprint
................................................................................................................................................
The civil structures consist of main factory buildings, waste paper godowns, finished goods godowns, boiler houses, transformer houses, D.G. set / Turbine houses, Administrative buildings, security cabins etc. The main factory buildings have also been provided with mezzanine floor, first floor, and second floor having limited area to accommodate processing machinery. All civil structures are well maintained.
|
................................................................................................................................................
Units have been adequately provided with cogen power plants to meet the power requirement Sanction for balance power requirement and emergency power requirement is arranged from State electricity grid.
|
................................................................................................................................................
| The requirement of water is quite large i.e. 15 KL per MT in the manufacturing of Coated Duplex Boards in all the manufacturing units and 15 KL per MT in the manufacturing of Newsprint. water is recycled in the process. There is no shortage of water in any of the units as it is adequately supplied by Gujarat Industrial Development Corporation (GIDC). |
................................................................................................................................................
About 70% of water used is discharged after treating from the manufacturing units is in the form of effluents which are suitably treated and drained in GIDC drainage. The Group has obtained proper "No Objection Certificates" for all its units from Gujarat Pollution Control Board (GPCB) for releasing such treated water in the GIDC drainage. All the units have been provided with Chimneys of adequate height as specified by GPCB to release smoke in the air.
ESP are installed for boilers in all the units to meet pollution control standards.
|
................................................................................................................................................
 The Group has ensured the availability of adequate protective attire and equipment for its workers working in the sensitive area where working could be hazardous.
Complete guidelines for safe operations have been prominently displayed in the respective operational area.
The Group has schemes for the insurance of workers against injuries / fatality while on duty.
The units are insured against natural calamities, have fire fighting equipments in place and are capable of thwarting risk of any major natural calamities. Smoke detectors have been installed wherever necessary.
Adequate security staff keeps a vigil on sensitive areas in the manufacturing locations round the clock and they are trained periodically in fire fighting practices. |
|